Category: casestudy

28 Sep 2025

Architectural Drawings Review CAPEX savings 65%

Case Study # 108 - Industrial: Our client wanted to create a spec space to show to industrial flex prospects. The original architectural drawings included two new ADA compliant bathrooms as part of the office buildout. This alone required over 100LF of trenching for drains. Trenching is always the most expensive part of plumbing.  These [...]
Continue Reading