Project vs. Portfolio
Case Study # 119 - Industrial: JCAT was invited to bid on a tenant build-out in Atlanta, GA. We explained to the Client that we could approach the build-out in two ways: Traditional GC Model Under the model used across the industry, JCAT would submit a bid based on the property manager’s scope of work. [...]
Speed to Market
Case Study # 112 - Industrial: Our client had adjacent vacant suites, and a prospective tenant wanted to sign a long-term lease for both. The tenant was expanding operations requiring the full build-out to be completed in less than eight weeks. Acting as the Property Owner’s fiduciary partner, JCAT coordinated with the architect to define [...]
Architectural Drawings Review CAPEX savings 65%
Case Study # 108 - Industrial: Our client wanted to create a spec space to show to industrial flex prospects. The original architectural drawings included two new ADA compliant bathrooms as part of the office buildout. This alone required over 100LF of trenching for drains. Trenching is always the most expensive part of plumbing. These [...]


